How to switch to Elyon
Choose the right profile and review the steps. Your power supply will not be interrupted — your distributor stays the same; only your supplier changes.
Request a quote for your association- Your power stays on
- Your distributor stays the same
- 100% online
Residents’ associations
A 9-step online process with no interruption to your power supply.
What we cover in the building
We take over the consumption of shared spaces, so the manager gets one clear invoice and one contact person for the whole property.
- Hallway and stairway lighting
- Lifts
- Pumps and water systems
- Basements and technical rooms
- Yard and outdoor lighting
- Waste rooms and annexes
- ~5 min
Create the residents’ association account
Open the platform and register using the residents’ association’s IDNO.
Important: The IDNO is the residents’ association’s unique identifier and is registered only once. If an account already exists for this IDNO, you will receive an information message.
- ~10 min
Complete the association profile
Enter the legal details, administrator details, and contact information. Consumption points are identified and assigned automatically by the system.
Important: Please make sure the information is correct and up to date so that it can be processed quickly.
- ~10 min
Complete the quote request
Specify the voltage type, consumption volume, and number of consumption points.
Important: You receive commercial terms optimized for the association’s profile.
- ~10 min
Upload the required documents
The residents’ association extract (issued no more than 3 months ago), the latest paid bill, and other relevant documents (power of attorney, etc.).
Important: Documents may be uploaded as PDF, JPG, or PNG files (max. 10 MB per file).
- 1–2 days
We review your request
Our team checks the documents and reviews the consumption profile to prepare a personalized quote.
Important: We may contact you by phone or email if clarification is needed.
- 1–2 days
Receive your personalized quote
The quote is sent by email, with prices and terms tailored to the association’s profile.
Important: You can ask your dedicated consultant questions by phone or email.
- ~1 day
Accept the quote and sign the contract
Sign the contract electronically or by hand, subject to availability.
Important: Once signed, the contract is registered and available in your account.
- 1–5 days
We install the smart reading device
We schedule and install a DTU (smart meter device) at the consumption points. No technical changes are required from you.
Important: We agree the appointment with you, coordinate with the system operator, and notify your current supplier.
- ~1 day
Become an active customer
We connect you to our system (CIS), register the contract, and begin supplying energy on the agreed date.
Important: Your account gives you real-time access to consumption, bills, and payments.
- Email notifications
- Data security
- Dedicated support
Documents required from the association
- Contract request form
- Association registration certificate (IDNO)
- Association statute and decision appointing the representative
- Documents for the common-use spaces
- List of consumption points and building addresses
- The latest invoice received/paid from the current supplier
How to switch to Elyon
A 9-step online process with no interruption to your power supply.
